loading.gif
Notes
Login Sign Up Shopping Cart 简体中文
Add to my favorite categories
category Small
Path Yahoo Bid > Fashion > Women's Clothes > T-shirts > Short Sleeves > Small
Remarks
Add my favorite keywords
Keywords
category Small
Remarks
Join my favorite seller
Seller 6sedJ***
Remarks
Add to my blacklist seller
Seller 6sedJ***
Remarks
Yahoo Bid Fashion Women's Clothes T-shirts Short Sleeves Small
送料185円■kw575■▼元町ゼラール バックボタンアクセント プルオーバー S ブラック 8900円相当【シンオク】【クリックポスト発送】    
     

  • Product Quantity
    : 1
  • Starting Bid
    :1,000円
  • Highest Bidder
    : bunny / Rating:1392
  • Listing Date
    :2025年10月22日 16時58分
  • Bidding closes on
    :2025年10月25日 21時24分
  • Auction Number
    :n1204933008
  • Condition
    :New product
  • Automatic Extension
    :Yes
  • Authentication
    :No
  • Early Closing
    :Yes
  • Can I return the product?
    :no
  • Description
  • Q&A ()
  • Cost Estimator
  • Problem Item Response Procedur
同梱フォームはこちら

▼元町ゼラール バックボタンアクセント プルオーバー S ブラック 8900円相当
数 量 1点
内 容 ■元町ゼラール ジャージー素材使用 バックボタンアクセント プルオーバー
■サイズ:S
■素材:綿60%、ポリエステル40%
■詳細:
・開きの場所/後中心
・開きの仕様/ボタン
・裏地/なし
・裾スリット/約右9cm、左9cm
・ポケット/なし
■カラー:ブラック

◆参考価格 8900円相当

スーパーハイゲージ(40ゲージ)で編み立てた、エグゼクティブジャージー素材を使用。
布帛のようななめらかで美しい表面感と、肌触りの良さを最大限に追求した軽やかな素材で、
スーピマコットンを混紡しているため、ナチュラルな風合いも楽しめます。
また、接触冷感性とUVカット(紫外線遮蔽率95%以上)、
防シワ性を備えている点もうれしいポイント。
傾斜をつけながらもクセ取りを行うことできれいなラインを描くフレンチスリーブは、
身頃から続きにして、ラウンド感のあるフォルムに仕上げました。
袖口はやや広めの切り替えを入れて厚みを出し、きちんとした雰囲気を演出。
ダブルステッチやコバステッチなどをポイントで使い分け、仕立て感の良さにもこだわりました。
発 送 【クリックポスト商品】
送料 185円(全国一律)
代引きでのお支払いと配達日時指定は出来ません。
※配達はポスト投函となります。
※到着まで3〜4日掛かります。
 (地域により異なる場合があります)
※複数落札の場合、当店判断でヤマト宅急便での発送となる場合があります。
 ご希望での変更は承れません。
※ヤフーのシステムでは北海道・東北・沖縄の方は送料0円と表記されますが
送料については当社ページ内の送料表をご参照ください
状 態 新品
その他 ※モニターの環境により、実際の商品と色味が多少違って見える場合があります。
注意事項 ※撮影・採寸の為、開封済みの場合がございます
※採寸、検品は素人が行っています。多少の誤差・見落としはご了承下さい。
※当社は破産管財物件を扱う会社の為、色々な商品を取り扱っておりますが商品によっては 詳細な知識が必要な物もあります。しかし、当方も素人の為、専門的な知識がありませんのでこちらで詳細の確認が出来ない場合もございます。予めご了承下さい。
※管財物件の為、特別に記載の無い小傷や汚れがある商品が含まれている可能性もございます。また、商品のメーカー保証はございません。神経質な方や些細な事をお気にされる方はトラブル防止のため入札をご遠慮頂きますよう予めお願い申し上げます。
ご理解の上、ご入札よろしくお願い致します。

お取り引きについて

▼▼▼ 購入手続きの流れ ▼▼▼

パソコン用はこちら

スマホ用はこちら

お支払について

お取り置きについて

The product has been closed, and you cannot ask questions.
Question list
All replies from original sellers (total number of questions: items)
After the seller responds, the original page will display the question
Product Price JPY
Japanese Consumption Tax(10%) JPY

A 10% consumption tax is applied to goods and services in Japan. The price may include the tax or it may be added separately. Please check the price details when ordering.

Note: This is a domestic sales tax applied within Japan.

Japan Local Shipping Fee JPY Japan Local Shipping Fee Reference
Product Weight KG The maximum weight limit is 30 kg
International Shipping Methods
Proxy bidding and purchasing services are becoming increasingly convenient. However, overseas shopping carries certain risks and issues. To reduce these risks and enhance shopping safety, please be sure to read the following information:

1. International Shipping

   Air Freight: If the item status is not confirmed within two days after the arrival notice, any customer complaints cannot be addressed with the seller.

2. After Receiving the Product

Please confirm and inspect the product as soon as possible to ensure that the product specifications, quantity, accessories, and description are correct

If, unfortunately, there are any issues, you can refer to the following examples on how to report related product problems:
1. Example of missing product information
2. Example of product not matching provided information
3. Example of damaged product information

Important Notes: 1. If the seller is unwilling to ship overseas or is unaware that the product will be shipped overseas, the international shipping cost for returns or exchanges will need to be borne by the member. You may refer to the EMS e-Express fee inquiry from the post office. If it involves alcoholic beverages or items that affect flight safety, the post office cannot be used for shipment, and only DHL can be used to ship back to Japan.
2. During the product complaint handling period, please retain the complete outer packaging of the product (including the shipping label information), and refrain from attempting any repairs or altering the original condition. Any modifications may result in the inability to process the case.

3. After Inspecting the Product

After receiving and inspecting the item, if you have any questions, it is recommended to contact Letao within 2 hours. Here are some reminders:

1. Please do not unpack, use or repair the received item yourself, and be sure to keep the original packaging to facilitate subsequent handling of related matters, so as to avoid changes to the item that may cause the seller to be unwilling to process.

2. You can call customer service, and the customer service will leave a message for you as below. Please provide the following information:
"Hello, we will first help you establish a complaint case for Product ID: _______ .But we need you to 2-3 clear photos of the product issue, including photos of the product problem, product packaging, shipping details slip, and outer box. Send them to service@letao.my and inform us of your desired resolution (failing to provide this may result in an inability to process subsequent matters). After sending the email, notify us in the customer service message. We will confirm with the seller as soon as possible. and if there are any related questions, we will contact you through the customer service message. Thank you for your cooperation."

Please provide:
1. "Product ID"
2. Photo of the "Delivery Note" (if any)
3. Photos of the outer box (including inner and outer packaging)
4. Photos of the product (Please include relevant descriptions to help us confirm with the seller)

Important Notes:
1. Do not include foreign text or other products in the background of the image.
2. Please keep the complete product packaging (including the shipping label information), and refrain from repairing or altering the original condition on your own, as any changes may result in the case being unable to be processed.
3. Please provide the relevant information within 48 hours to avoid missing the golden hour for reflection and causing situations that cannot be handled.
4. Due to 99% of Japanese sellers being unwilling or unaware of shipping goods overseas, if a seller is willing to handle the issue, the goods must be sent back to Japan, and the international shipping costs incurred must be borne by the member. Letao will use postal EMS international express to send the goods back to Japan.
5. As the goods are purchased from overseas, it may take approximately one to two weeks to complete the relevant processing procedures when issues arise with the goods. Please be reminded that you can inquire about the approximate cost through the EMS service at the post office.

4. FAQ

1. Issue of Authenticity: If antique or branded goods are found to be counterfeit upon receipt, clear photos showing the differences between the genuine product and the imitation must be provided as evidence. If unable to provide relevant proof, assistance can be sought to find a third-party reputable organization for a premium authentication service .
2. Leaking Iron Teapot: If an antique iron teapot is leaking, please take clear photos of the leaking area and provide them.
3. Transport Damage: If the goods are damaged during international shipping (to the pickup point), you need to provide photos of the outer packaging of the parcel and clear photos of the damaged goods' outer packaging.

※ Note: Photos provided to sellers should not contain any foreign-related information.
You may also like
    Seller products
    Excite Translate
    Add to watchlist and notes
    Product name: 送料185円■kw575■▼元町ゼラール バックボタンアクセント プルオーバー S ブラック 8900円相当【シンオク】【クリックポスト発送】
    Notes:
    Customer service hours:
    • Monday to Friday 10:00-18:00
    Customer service hotline:
    Customer Service Email: service@letao.my