loading.gif
Notes
Login Sign Up Shopping Cart 简体中文
Add to my favorite categories
category Medals
Path Yahoo Bid > Hobbies & Crafts > Military Supplies > Accessories > Badges & Medals > Medals
Remarks
Add my favorite keywords
Keywords
category Medals
Remarks
Join my favorite seller
Seller 9EkhR***
Remarks
Add to my blacklist seller
Seller 9EkhR***
Remarks
Yahoo Bid Hobbies & Crafts Military Supplies Accessories Badges & Medals Medals
【勲章】 勲四等瑞宝章 額入り 略綬有 額装:約35×30cm 記章 勲章ケース有 03407007-2
     

  • Product Quantity
    : 1
  • Starting Bid
    :1,000円
  • Highest Bidder
    : ぱろぱろ / Rating:536
  • Listing Date
    :2025年08月05日 15時56分
  • Bidding closes on
    :2025年08月11日 21時09分
  • Auction Number
    :s1195308922
  • Condition
    :Damaged and stained (specify in description)
  • Automatic Extension
    :Yes
  • Authentication
    :No
  • Early Closing
    :Yes
  • Can I return the product?
    :no
  • Description
  • Q&A ()
  • Cost Estimator
  • Problem Item Response Procedur
Notes
  1. Weapons and equipment such as guns, magazines, bullets, knives, gas masks, etc. cannot be imported. If you confirm that this product can be imported, click Confirm and place a bid.
  2. Faulty product, please pay attention before subscribing
  3. It is possible that the product can only be picked up by yourself, and the self-pickup fee is quite high, please check the page to confirm
  4. The page has a fragile description, and fragile items cannot be shipped by sea. They can only be shipped by air. If the goods are not fragile, they can be shipped by air.


The
商品説明
- 送料について ー

●発送 :送料「1400円」 ゆうパック※追尾あり・保証あり)
※3辺160㎝以上の品物は着払い対応となります。
・北海道、沖縄・離島の方は上記の送料に「+600円」となります。
※送料については箱代等も含まれております、ご了承願います。
※海外の発送については対応致しかねます。
※配送に伴う保証については付属品となる額縁・額装・表装・箱・ガラスケースについては、あくまで本製品の付属品としたものとし、配送時の破損・返品、保証の対象外となります。
※郵便局留をご希望の場合、必ず指定郵便局の住所を明記してください。
ご本人の連絡先(電話番号)も必須です。

- 『品物の詳細について』 -

●時代物に関しましては個人の見解に差違が生じる場合がございます。写真をご参照いただき、ご理解いただいた上でのご入札をお願いします。

●骨董品の性質上、経年のスレ、極小キズ、釉薬のくもりなど有る場合がございます。明らかな人為的ダメージ等以外は明記いたしません。

●付属品(箱、栞、布etc)につきましても汚れシミなどある場合がございます。

●作動確認済について。ゼンマイが巻けて歩く、電池式の場合の作動確認。
但し個人の違和感等の返品には対応してませんのでご理解ご了承ください。


- 『店頭引き渡しについて』 -

●兵庫県 尼崎市内に店舗がございます。
●直接引き取りに来れる方は落札後、取引ナビより事前にお知らせください。
●お車でのご来店も可能です。店舗前に駐車、又は専用の駐車場をご利用下さい。
●作品の引取りはご落札後10日以内でお願いします。

- 『出品作品の取り消しについて』 -
●掲載写真、商品タイトル、説明文などに誤りが発覚した場合。
入札されている方に大変申し訳ありませんが、予告なくオークションの「取り消し」をさせて頂く場合がございます。

- 『絵画・掛軸の表記について』 -

●Yahoo!オークションでは、2017年10月25日から<絵画の出品に関するルール改定>が施行されます。
つきましては、弊社では絵画・掛軸の出品に於いて、特定の作者の作品と記載、もしくは署名落款がある場合、【真作】または【模写】と明記することとなりました。

●タイトルにございます分類は下記の通りとなります。
ご確認の上、十分にご検討いただきご入札をお願い申し上げます。

【真作】
真作であると保証できる作品を、真作と表記いたします。
作者自身が作成した、作者またはご遺族等公認で作成した リトグラフ、作者が本絵、元形を作成した木版画などの版画作品なども対象となります。
【模写】
真贋の判断ができない場合、模写と表記いたします。
少しでも真作ではないと疑いのある作品 古い作品、所定の鑑定機関のない作品などが対象となります。
※詳しくは Yahoo!オークションガイドライン細則 の「出品ルール>美術品」をご覧ください。

- 『保証について』 -

・商品タイトルの文言に「真作」と明記しております商品が、公定鑑定機関または公定鑑定人に『贋作』と判断された場合は落札代金と送料を返金いたします。

【備考】
・御落札後、異議申し立てされる場合は以下のご対応お願い申し上げます。
・物故作家の場合、公的、又は、所定鑑定機関発行の鑑定書・証明書、あるいは作家のご遺族による所見を記した署名・捺印・日付のある書面をご用意ください。

・現存作家の場合、作家自身の署名・捺印・日付のある書面を御用意の上申し立て下さい。
(絵画収集家・専門家・美術館・学芸員・画廊・所定鑑定人となっていない作家親族などによる判断は、正式な鑑定とは認められません。)

その上で真作でないと判断された場合、落札金額を返金致します。
但し、購入代金の払い戻しをする以外に一切の義務はなく、損害賠償・利息・鑑定料・鑑定に掛かる送料・損害金・その他の費用の支払いは一切致しません。

・商品落札日翌日から原則一週間の間に鑑定を依頼する旨と鑑定ご依頼先をご連絡ください。

・落札日より一週間の間にご連絡の無い場合は保証対象外となりますのでご注意ください。

・鑑定を要するまでの保証期間はご連絡頂いた日付より「90日間」といたします。

・ご不明な点等、御座いましたら出品中にお問い合わせ下さいませ。

- 『入札について』 -

◆ご入札のお取消しは致しかねます。十分にご注意の上、ご入札をいただけますようお願いいたします。
◆落札後のお客様都合によるキャンセルは「一切応じません」入札前に十分にご検討頂いた上で入札及び、落札をお願い致します。
◆PC環境により色など実物と多少誤差が生じる場合があることを、予めご了承ください。
◆スムーズなお取引を行うため、その旨よくご検討の上、ご入札下さい。
◆新規または悪い評価が多い方は、こちらの判断で入札お断りする場合も御座います。予めご了承下さい。
◆出品作品表示内容の相違や委託品の場合はオークションを中止する場合がございます。
◆落札者様から評価をいただいた場合のみ、評価をさせていただいております。
 
- 『返金・返品について』 -

【返品・返金】
◆お客様都合の商品の返品・キャンセル・交換は承っておりません。
但し、写真に映っていない重大な欠陥や不良(ジャンク品は除く)が、見受けられた場合、返品・返金の対応をいたします。

その他の原因の場合、取引ナビ、又はお電話にてお問い合わせください。
※額縁・額装・表装・箱・ガラスケースについては、あくまで本製品の付属品としたものとし、破損・返品の保証対象外となります。

◆商品到着後1週間以内にご連絡ください。
なお、商品到着後に状態が変わったもの(使用した、傷や汚れが付いた、刀身を
研磨した等)につきましては、返品・交換はお受付出来かねます。
※商品到着後1週間以上経過した商品はいかなる場合も返品をお受けできませ
ん。

ジャンク品】
◆写真に映しきれない詳細・劣化などによる破損が発覚した場合や、部品取り・修理
等の再利用を目的とした状態・作動等の保証は致しかねます。
予めご了承頂きますようお願い致します。


* * * この案内は、AIが写真から商品の特徴や状態を分析し、商品の魅力的な紹介文が簡単に作れる いめーじあっぷで作成しました。(無料) * * *

The product has been closed, and you cannot ask questions.
Question list
All replies from original sellers (total number of questions: items)
After the seller responds, the original page will display the question
Product Price JPY
Japanese Consumption Tax(10%) JPY

A 10% consumption tax is applied to goods and services in Japan. The price may include the tax or it may be added separately. Please check the price details when ordering.

Note: This is a domestic sales tax applied within Japan.

Japan Local Shipping Fee JPY Japan Local Shipping Fee Reference
Product Weight KG The maximum weight limit is 30 kg
International Shipping Methods Get Your Limited-Time International Shipping Discount Now!
Proxy bidding and purchasing services are becoming increasingly convenient. However, overseas shopping carries certain risks and issues. To reduce these risks and enhance shopping safety, please be sure to read the following information:

1. International Shipping

   Air Freight: If the item status is not confirmed within two days after the arrival notice, any customer complaints cannot be addressed with the seller.

2. After Receiving the Product

Please confirm and inspect the product as soon as possible to ensure that the product specifications, quantity, accessories, and description are correct

If, unfortunately, there are any issues, you can refer to the following examples on how to report related product problems:
1. Example of missing product information
2. Example of product not matching provided information
3. Example of damaged product information

Important Notes: 1. If the seller is unwilling to ship overseas or is unaware that the product will be shipped overseas, the international shipping cost for returns or exchanges will need to be borne by the member. You may refer to the EMS e-Express fee inquiry from the post office. If it involves alcoholic beverages or items that affect flight safety, the post office cannot be used for shipment, and only DHL can be used to ship back to Japan.
2. During the product complaint handling period, please retain the complete outer packaging of the product (including the shipping label information), and refrain from attempting any repairs or altering the original condition. Any modifications may result in the inability to process the case.

3. After Inspecting the Product

After receiving and inspecting the item, if you have any questions, it is recommended to contact Letao within 2 hours. Here are some reminders:

1. Please do not unpack, use or repair the received item yourself, and be sure to keep the original packaging to facilitate subsequent handling of related matters, so as to avoid changes to the item that may cause the seller to be unwilling to process.

2. You can call customer service, and the customer service will leave a message for you as below. Please provide the following information:
"Hello, we will first help you establish a complaint case for Product ID: _______ .But we need you to 2-3 clear photos of the product issue, including photos of the product problem, product packaging, shipping details slip, and outer box. Send them to service@letao.my and inform us of your desired resolution (failing to provide this may result in an inability to process subsequent matters). After sending the email, notify us in the customer service message. We will confirm with the seller as soon as possible. and if there are any related questions, we will contact you through the customer service message. Thank you for your cooperation."

Please provide:
1. "Product ID"
2. Photo of the "Delivery Note" (if any)
3. Photos of the outer box (including inner and outer packaging)
4. Photos of the product (Please include relevant descriptions to help us confirm with the seller)

Important Notes:
1. Do not include foreign text or other products in the background of the image.
2. Please keep the complete product packaging (including the shipping label information), and refrain from repairing or altering the original condition on your own, as any changes may result in the case being unable to be processed.
3. Please provide the relevant information within 48 hours to avoid missing the golden hour for reflection and causing situations that cannot be handled.
4. Due to 99% of Japanese sellers being unwilling or unaware of shipping goods overseas, if a seller is willing to handle the issue, the goods must be sent back to Japan, and the international shipping costs incurred must be borne by the member. Letao will use postal EMS international express to send the goods back to Japan.
5. As the goods are purchased from overseas, it may take approximately one to two weeks to complete the relevant processing procedures when issues arise with the goods. Please be reminded that you can inquire about the approximate cost through the EMS service at the post office.

4. FAQ

1. Issue of Authenticity: If antique or branded goods are found to be counterfeit upon receipt, clear photos showing the differences between the genuine product and the imitation must be provided as evidence. If unable to provide relevant proof, assistance can be sought to find a third-party reputable organization for a premium authentication service .
2. Leaking Iron Teapot: If an antique iron teapot is leaking, please take clear photos of the leaking area and provide them.
3. Transport Damage: If the goods are damaged during international shipping (to the pickup point), you need to provide photos of the outer packaging of the parcel and clear photos of the damaged goods' outer packaging.

※ Note: Photos provided to sellers should not contain any foreign-related information.
You may also like
    Seller products
    Excite Translate
    Add to watchlist and notes
    Product name: 【勲章】 勲四等瑞宝章 額入り 略綬有 額装:約35×30cm 記章 勲章ケース有 03407007-2
    Notes:
    Customer service hours:
    • Monday to Friday 10:00-18:00
    Customer service hotline:
    Customer Service Email: service@letao.my