loading.gif
Notes
Login Sign Up Shopping Cart English
Add to my favorite categories
category Main Body
Path Yahoo Bid > Home Appliances, Audio & Video, Camera > Audio Equipment > Speakers > General > JBL > Main Body
Remarks
Add my favorite keywords
Keywords
category Main Body
Remarks
Join my favorite seller
Seller D4d7T***
Remarks
Add to my blacklist seller
Seller D4d7T***
Remarks
Yahoo Bid Home Appliances, Audio & Video, Camera Audio Equipment Speakers General JBL Main Body
 Store ■□【全国発送可】JBL 4343WX スピーカーペア エッジ交換済□■030472002WJ-3□■
        

  • Product Quantity
    : 1
  • Starting Bid
    :1,000円
  • Highest Bidder
    : ク-ニ-小野 / Rating:550
  • Listing Date
    :2026年04月15日 22時10分
  • Bidding closes on
    :2026年04月22日 20時32分
  • Auction Number
    :t1226672452
  • Condition
    :Damaged and stained (specify in description)
  • Automatic Extension
    :Yes
  • Authentication
    :No
  • Early Closing
    :Yes
  • Can I return the product?
    :no
  • Description
  • Q&A ()
  • Cost Estimator
  • Problem Item Response Procedur
Notes
  1. Faulty product, please pay attention before subscribing
  2. It is possible that the product can only be picked up by yourself, and the self-pickup fee is quite high, please check the page to confirm
  3. The items for sale may be for exchange and are not simply for sale. Please confirm the page before making a bid.
  4. To enjoy bidding, please review the auction rules before bidding.
  5. The product location is far from the overseas delivery address (Kanagawa), please pay attention to the Japanese shipping fee

The
The
The
The
The
The
The
■□【全国発送可】JBL 4343WX スピーカーペア エッジ交換済□■030472002WJ-3□■

商品説明

■メーカー : JBL
■型番 : 4343WX
■外径寸法 : W635×H1060×D440mm
■重量 : 78.0kg
※弊社実測の為、多少の誤差はご了承下さい。
※ペアでの出品となります。
※当店にて左右LOW/MIDエッジ交換済みです。

構成は下記となります。
LOW : JBL 2231A
MID : JBL 2121
音響レンズ : JBL 2308

【商品の状態 当店での確認内容】

動作確認をしたところ、片方HIGHのLEVELツマミ+3付近以外/ULTRA HIGHから出音が確認出来ません。また、LEVELツマミに若干ガリがございます。

背面端子1カ所に破損がございます。(使用は問題ございません)
サランネットに破れ・汚れ・ダボ折れ/エンブレムの位置が変更されております。

※上記により【難あり商品】としての出品となります。

「商品の状態」に関しましては当方主観の目安となります。外観などは中古品で個人差もありますので詳細は画像にてご判断ください。
画像にて不明な点はご質問下さい。
出品商品は画像のものですべてになります。画像に写っているもの以外は付属いたしません。

※注意※
ヤフオクのシステム上、送料表記が送料0円となっておりますが、送料に関しては全て有償となりますので下記を参照下さい。


【送料 重量物の為、搬入状況により変動いたしますので別途お問合せください】
※ピアノ運送または重量物専門業者による配送となります。
※当商品は送料が高額になることが予想される為、ご落札者様で運送会社を手配頂くことも可能ですのでお問い合わせください。

※重量物配送に関しましては地域・搬入先状況によって異なりますので、ご入札前に下記メールアドレスまでお問い合わせ下さい。
auctions@tunagu-inc.co.jp

※お届けまでに1週間以上かかる場合もございます。
※本商品は配達日時指定不可となります。
※原則、玄関先でのお渡しとなっておりますが別途ご指定の場所まで運ばせて頂くサービスもございます(有料)
※落札後、送料が高い等の理由でのキャンセルはお受け出来ませんので予めご了承ください。

※送料がお得になるサービスです(下取りシステムのご案内です)


ストア決済利用時にクレジットカードPayPay残高/PayPayクレジットを利用の方は留意点がございますのでこちらを参照上ご利用ください。

当ストアでは商品を安全にお届け出来るよう提携運送会社と協議の上、発泡緩衝材や強度段ボールの使用等
運送会社が指定する梱包方法や資材を採用しております。
より安全にお届け出来るよう商品仕様により梱包サイズが大きくなる場合や個口数が増える事がございます。

【当ストアオークションルールを入札前に必ずご確認ください。】

【落札後の取引手順】
・落札後は取引ナビにて、必要事項をご入力後、送信ください。
 取引終了後48時間(土、日は除く)以内に入力をお願い致します。
 ※ご連絡が頂けない場合は落札者様都合でのキャンセルとさせていただきます。

・落札代金(商品代金+消費税+送料)の入金をお願い致します。
※大型商品の場合は送料確定後の決済となる為取引ナビを入力頂き、当ストアより送料のご案内が来るまでお待ちください。(土曜、日曜、祝日の場合は翌営業日より順次ご案内いたします)

・お支払い方法はクレジットカード/PayPay残高/PayPayクレジット/PayPay銀行/ゆうちょ銀行のみです。
※商品代金引換(代引き)のお取り扱いはしておりません。
※領収証の発行が必要な方はご連絡ください。
※銀行振込の際の振込手数料はご負担願います。

・入金確認後に出荷手配を致します。
(原則入金確認後3営業日以内に発送いたしますが、大型や重量のある製品はお時間をいただく場合もございます。)

・発送は当店指定の運送会社の元払いのみでの発送となります。
※他の運送会社、送料代引き等は致しかねます。
※落札者様ご自身での運送会社の手配いただく事も可能ですが荷物事故の責任の所在の問題上、梱包は致しかねます。
※店頭にお越し頂き手渡しも可能(福岡市早良区)です。ご希望の方はご落札後にご連絡下さい。

・大型/重量物商品の送料につきましては商品の特性上、荷降ろし状況等により送料が大きく前後し運送業者に別途見積りが必要な為、早めのお問い合わせにてお見積り上、入札をお願い致します。


【初期不良の保証について】
・商品到着後の初期動作不良、また配送中の事故による破損、不具合が有る場合は、商品到着後7日以内に当ストアまでご連絡ください。当ストアでは修理での対応を優先させて頂きますが、修理不可の場合は全額返金させて頂きます。
(商品代金+消費税+送料のお支払い頂いた金額となります)

【初期不良の保証の対象外について】
次の場合は保証の対象外となりますのご留意ください

ジャンク商品、現状商品、難あり商品での出品商品。
※難あり商品に関しましては動作確認時に一部動作不良が確認された商品になり、記載している動作確認以外にも、動作不良がある可能性もございます。こちらに関しましても保証対象外となりますことをご理解ください。

オーディオ機器で前オーナー様が当店にてわからない範囲で部品が交換されている場合。
(当店でも全てのオーディオ機器の仕様は把握しておりませんので画像にてご判断、または入札前にご質問をお願いします)

・楽器類の特殊機材(マイクロスコープ等)での確認までは行っておりません。気になる方は事前にご質問いただくか、入札をお控えください。

※初期不良に関しましては【商品の状態】に記載のもの、またそれによって起因する動作不良は対象外です。
※商品到着後7日を過ぎてのご連絡は対応が出来ませんので、商品が到着しましたらお早めに確認をお願い致します

【メーカー保証の加入・継承】
・未使用品、展示品やメーカー保証期間が残っている商品に関しまして、メーカー保証の加入、継承が必要な方は、落札後取引ナビ内にて当ストアにお知らせください。商品発送までにご連絡いただけない場合、メーカー保証の手続きを承れない場合があります。

【評価について】
・評価不要の場合、必ず取引ナビの「要望欄」にてお知らせください。それ以外でご連絡をいただいた場合、対応できない可能性がございます。一度行った評価はシステム上取り消しが行えませんのでご了承ください。

【入札削除・キャンセルについて】
・入札後はトラブル防止の為いかなる事情がおきましても入札を削除等は致しておりません。
ご検討の上入札をお願い致します。間違った際の入札額の金額訂正はご自身で行ってください。
入札額の変更方法
入札額の変更方法
【入札に関しての注意事項】
・最近イタズラ入札が多く見られるため、新規IDや悪い評価が一定数あるIDからの入札は当店の判断により取り消しをさせていただく場合がございます。
新規IDの入札者様はご面倒ですが事前に質問欄よりご連絡いただければ幸いです。

・想定価格を大幅に下回った際は出品を取消す場合がございます。

Q&Aを設置いたしましたのでこちらをご覧ください。
こちらの商品案内は 「■@即売くん5.70■」 で作成されました。

Please log in before asking questions
Question list
All replies from original sellers (total number of questions: items)
After the seller responds, the original page will display the question
Product Price JPY
Japanese Consumption Tax(10%) JPY

A 10% consumption tax is applied to goods and services in Japan. The price may include the tax or it may be added separately. Please check the price details when ordering.

Note: This is a domestic sales tax applied within Japan.

Japan Local Shipping Fee JPY Japan Local Shipping Fee Reference
Product Weight KG The maximum weight limit is 30 kg
International Shipping Methods
Proxy bidding and purchasing services are becoming increasingly convenient. However, overseas shopping carries certain risks and issues. To reduce these risks and enhance shopping safety, please be sure to read the following information:

1. International Shipping

   Air Freight: If the item status is not confirmed within two days after the arrival notice, any customer complaints cannot be addressed with the seller.

2. After Receiving the Product

Please confirm and inspect the product as soon as possible to ensure that the product specifications, quantity, accessories, and description are correct

If, unfortunately, there are any issues, you can refer to the following examples on how to report related product problems:
1. Example of missing product information
2. Example of product not matching provided information
3. Example of damaged product information

Important Notes: 1. If the seller is unwilling to ship overseas or is unaware that the product will be shipped overseas, the international shipping cost for returns or exchanges will need to be borne by the member. You may refer to the EMS e-Express fee inquiry from the post office. If it involves alcoholic beverages or items that affect flight safety, the post office cannot be used for shipment, and only DHL can be used to ship back to Japan.
2. During the product complaint handling period, please retain the complete outer packaging of the product (including the shipping label information), and refrain from attempting any repairs or altering the original condition. Any modifications may result in the inability to process the case.

3. After Inspecting the Product

After receiving and inspecting the item, if you have any questions, it is recommended to contact Letao within 2 hours. Here are some reminders:

1. Please do not unpack, use or repair the received item yourself, and be sure to keep the original packaging to facilitate subsequent handling of related matters, so as to avoid changes to the item that may cause the seller to be unwilling to process.

2. You can call customer service, and the customer service will leave a message for you as below. Please provide the following information:
"Hello, we will first help you establish a complaint case for Product ID: _______ .But we need you to 2-3 clear photos of the product issue, including photos of the product problem, product packaging, shipping details slip, and outer box. Send them to service@letao.my and inform us of your desired resolution (failing to provide this may result in an inability to process subsequent matters). After sending the email, notify us in the customer service message. We will confirm with the seller as soon as possible. and if there are any related questions, we will contact you through the customer service message. Thank you for your cooperation."

Please provide:
1. "Product ID"
2. Photo of the "Delivery Note" (if any)
3. Photos of the outer box (including inner and outer packaging)
4. Photos of the product (Please include relevant descriptions to help us confirm with the seller)

Important Notes:
1. Do not include foreign text or other products in the background of the image.
2. Please keep the complete product packaging (including the shipping label information), and refrain from repairing or altering the original condition on your own, as any changes may result in the case being unable to be processed.
3. Please provide the relevant information within 48 hours to avoid missing the golden hour for reflection and causing situations that cannot be handled.
4. Due to 99% of Japanese sellers being unwilling or unaware of shipping goods overseas, if a seller is willing to handle the issue, the goods must be sent back to Japan, and the international shipping costs incurred must be borne by the member. Letao will use postal EMS international express to send the goods back to Japan.
5. As the goods are purchased from overseas, it may take approximately one to two weeks to complete the relevant processing procedures when issues arise with the goods. Please be reminded that you can inquire about the approximate cost through the EMS service at the post office.

4. FAQ

1. Issue of Authenticity: If antique or branded goods are found to be counterfeit upon receipt, clear photos showing the differences between the genuine product and the imitation must be provided as evidence. If unable to provide relevant proof, assistance can be sought to find a third-party reputable organization for a premium authentication service .
2. Leaking Iron Teapot: If an antique iron teapot is leaking, please take clear photos of the leaking area and provide them.
3. Transport Damage: If the goods are damaged during international shipping (to the pickup point), you need to provide photos of the outer packaging of the parcel and clear photos of the damaged goods' outer packaging.

※ Note: Photos provided to sellers should not contain any foreign-related information.
You may also like
    Seller products
    Excite Translate
    Add to watchlist and notes
    Product name: ■□【全国発送可】JBL 4343WX スピーカーペア エッジ交換済□■030472002WJ-3□■
    Notes:
    Customer service hours:
    • Monday to Friday 10:00-18:00
    Customer service hotline:
    Customer Service Email: service@letao.my